TITLE: 06/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: One lock loss and some commissioning time today. Relock was automated with an initial alignment.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 18:36 | SAF | - | LVEA | YES | LVEA is laser HAZARD | 05:15 |
| 15:26 | PCAL | Tony, Emmanuel | PCAL lab | no | Tour and cleaning access | 15:56 |
| 15:27 | FAC | Karen | PCAL, Opt lab | n | Tech clean | 16:04 |
| 15:35 | - | Chris (photographer) | Xarm | n | Taking photos | 18:45 |
| 16:04 | FAC | Karen | MY | n | Drop off materials | 16:44 |
| 16:36 | SQZ | Kar Meng | Opt Lab | Local | SHG work | 18:04 |
| 17:09 | FAC | MacMiller, Tyler | EX | n | Contractor chiller work | 22:36 |
| 17:15 | PCAL | Francisco | PCAL lab | local | Check meas. | 18:03 |
| 20:45 | SQZ | Kar Meng | Opt Lab | local | SHG work | 00:08 |
| 21:42 | PCAL | Tony, Francisco | PCAL Lab | local | Set up measurement | 22:50 |
| 21:56 | - | Chris (Photographer) | OSB roof | n | Roof pictures | 22:46 |