LHO General
corey.gray@LIGO.ORG - posted 16:30, Monday 24 June 2024 (78614)
Mon DAY Ops Summary

TITLE: 06/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
INCOMING OPERATOR: RyanS
SHIFT SUMMARY:

Today there was a 3hr Commissioning Period, but down time extended a couple of hours after that due to a lockloss (which also had a very misaligned BS & SR2 and SRM).  There was a retracted superevent.  And during the handoff a few minutes ago, H1 was dropped from observing due to the Camera26 (Beamsplitter); Dave restarted it to get us back to Observing.  There is high frequency noise for H1 even after 2.5hrs of thermalizing.  Ryan and Camilla chatted about dropping H1 out of OBSERVING to run the SQZ ANG and also try a feed forward set-up within this hour.
LOG: