Reports until 16:32, Tuesday 25 June 2024
H1 General (DetChar)
oli.patane@LIGO.ORG - posted 16:32, Tuesday 25 June 2024 (78658)
Ops Day Shift End

TITLE: 06/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 145Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:  Currently Observing and have been Locked for almost 2 hours.
LOG:

14:30 Detector already unlocked and maintenance started

19:37 Took detector to DOWN and then started an initial alignment
    - Couldn't see ALSX at all, ended up running the dither align scripts (TMSX, ITMX, and ETMX) and then using the quick sweep from the ETMX dither align script to find a good alignment for ETMX
20:47 Initial alignment done, relocking
21:37 NOMINAL_LOW_NOISE
22:00 Observing
22:22:06 - 22:22:15 Quick jump out and back into Observing due to misclick

23:20 - 23:30 The second Norco truck came down the Xarm and by the corner station on the way back from a CP fill at MX, causing some ground motion tagging Detchar                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          

Start Time System Name Location Lazer_Haz Task Time End
14:10 FAC Kim EX n Tech clean 15:15
14:11 FAC Karen EY n Tech clean 15:06
14:14 VAC Gerardo LVEA n Drilling holes 17:15
14:15 CDS Marc, Erik EX n Install DAC card in H1SUSEX 15:02
15:08 EE Fil, Camilla LVEA yes Swap sqz chassis 15:30
15:09 VAC Jordan MY EY n Turbopump checks 18:02
15:10 VAC Isaiah LVEA n Joining Gerardo 16:47
15:21 FAC Tyler LVEA-WB n Craning in West Bay, going to HAM Shack 18:37
15:22 CDS Marc, Erik EX n Undoing H1SUSEX work 16:19
15:23 IAS, PSL Jason, Christina LVEA-WB n Setting up FARO/PSL property check (Christina out ~16:00) 17:14
15:31 SAF Camilla LVEA yes Transition LVEA to SAFE 15:45
15:41 VAC Janos LVEA n Joining Gerardo and Isaiah 16:46
15:42 PCAL Francisco, Rick PCAL Lab yes(local) PCAL things 16:36
15:45 FAC Chris EX n Filter checks 19:50
15:47 FAC Karen, Kim, Nellie HAM Shack n Tech clean 16:22
15:52 EE Fil Roof n Checking roof Camera hardware 17:12
15:55 SQZ Terry Optics Lab yes(local) SHG 20:05
15:57 SUS Jim CR n SRM offloading, filter change 18:43
16:20 PEM Robert LVEA n Setting up for injections 18:18
16:23 SQZ Kar Meng Optics Lab yes(local) SHG 20:05
16:36 PCAL Francisco, Rick End X YES PCAL Beam Movement 18:51
16:39 TOUR Jeff + GWANW Tour LVEA n GWANW tour 17:45
16:47 VAC Gerardo, Isaiah HAM Shack n Testing cables 17:45
16:56 TOUR Camilla + tour LVEA n tour 18:17
16:57 TOUR Sheila + tour LVEA n GWANW tour 18:17
16:59 FAC Kim, Karen LVEA n Tech clean (Kim out 18:45) 18:22
17:06 FAC Christina OSB Recieving n Forklift pallet 17:45
17:12 TOUR TJ + Tour LVEA n GWANW tour 17:57
17:14 EE Fil LVEA n Fixing humidity sensor 17:46
17:14 IAS Jason, Ryan C, Tyler LVEA n FARO measurements (Jason, Ryan C out 18:58) 18:57
17:16   Corey, intern EX, EY n Looking at vegetation along arms 18:16
17:46 EE Fil EX, MX n Dropping stuff off, working on camera 18:52
17:57 VAC Gerardo, Isaiah LVEA n Drilling holes 19:23
18:20 PEM Robert EX, EY n Looking for equipment 18:58
19:30 PEM Sheila, Robert LVEA n Magnetometer moves 19:49
19:54 PCAL Rick, Evan PCAL Lab y(local) PCAL things (Evan in at 20:38) 21:49
19:57 PEM Robert LVEA N Move magtometer 20:02
20:27 PEM Robert LVEA n Moving magnetometer 20:31
20:44 VAC Gerardo LVEA (Y-term. slab) n Investigating broken pump 21:09
20:49 VAC Janos, Isaiah CER n Getting an air sampler 21:09
21:01 SQZ Kar Meng Optica Lab y(local) SHG 21:53
22:01 EE Fil MY n Camera fix 22:38
22:38 PEM Robert, Neil, others EY n Picking up a small slab of granite 23:13
22:56 PCAL Francisco PCAL Lab y(local) PCALing ongoing
Images attached to this report