TITLE: 06/26 Eve Shift: 2300-0800 UTC (1600-0100 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 20mph Gusts, 16mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.06 μm/s
QUICK SUMMARY:
Current SQZ issue is Pump Fiber rej port in HAM7 High, nominal 35E-3, align fiber pol in sqzt0
H1:SQZ-SHG_FIBR_REJECTED_DC_POWER = 0.312
I understand I should move the Pico motors before Inject Squeezing.