Displaying report 1-1 of 1.
Reports until 16:31, Thursday 27 June 2024
H1 General
oli.patane@LIGO.ORG - posted 16:31, Thursday 27 June 2024 (78713)
Ops Day Shift End

TITLE: 06/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Currently Observing and have been Locked for 21 minutes. Lots of issues with ALSX PLL today (78703), as a continuation/extension of the problems we have been having with ALSX the past few days. After troubleshooting and multiple hours down after the 17:08 lockloss, we seemed to be clear of the PLL unlocking issue after I noticed that the PLL had managed to stay locked for 25 minutes, and then relocking went just like normal.
LOG:

14:30 Detector Observing at 155Mpc and has been Locked for almost 5 hours

15:32 Out of Observing for calibration measurements (78699) and commissioning
    15:39 bb done
    16:01 Simulines done
16:03 Lockloss right at beginning of commissioning
16:04 Started an initial alignment
    - had to touch up ALSY because increase flashes couldn't catch it
16:41 Initial alignment done, going to sit in DOWN for commissioning test
17:08 Starting relocking
    - Lockloss from LOCKING_ARMS_GREEN x2
    - earthquake starts rolling through
    - Lockloss from ACQUIRE_PRMI
    - Held in GREEN_ARMS_MANUAL to check for issues with ALSX PLL
    - Lockloss from FIND_IR x3
18:06 I started another initial alignment, skipping over green GREEN_ARMS_MANUAL
18:19 Initial alignment done, relocking
    - CHECK_CRYSTAL_FREQUENCY for ALSX
    - lockloss from LOCKING_ALS
    - CHECK_CRYSTAL_FREQUENCY for ALSX
    - Lockloss from FIND_IR x 2
- Sitting in GREEN_ARMS_MANUAL due to ALSX PLL unable to stay locked, even when ALSX is in the UNLOCKED state 

20:03 Trying relocking after I saw that the last PLL error was from 25 minutes ago
    - Everything worked perfectly
20:45 NOMINAL_LOW_NOISE
20:48 Observing

21:45 Lockloss
21:48 Initial alignment
22:09 IA done, relocking
23:01 NOMINAL_LOW_NOISE
23:04 Observing                                                                                                                                                                                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
14:55 PCAL Rick PCAL Lab y(local) Grab stuff for LLO 15:07
15:41 FAC Karen WS/FirePump n Tech clean 17:03
15:42 SAF Camilla, Iain LVEA n Transitioning to laser hazard 15:56
16:08 SAF LVEA LVEA YES LVEA IS LASER HAZARD 10:08
16:46 PEM Robert LVEA YES Viewport scattering commissioning 20:24
16:54 ISC Jenni CR n Commissioning test 17:52
16:58 SQZ Kar Meng Optics Lab y(local) Working on SHG 19:11
17:03 FAC Karen VacPrep n Tech clean 17:13
17:58 PCAL Francisco, Rick PCAL Lab y(local) Lab upgrades 21:00
18:11 FIT Jenni, Camilla, Isaiah MY n Running really slow 18:51
21:12 SQZ Kar Meng, Terry Optics Lab y(local) SHG (Terry out 21:28) ongoing
21:16 SAF Richard, Fil XARM n Looking for exposed ALS cable 21:00
21:16 EE Fil MY n Dropping off parts 21:50
21:51 PCAL Francisco PCAL Lab y(local) Upgrading lab 22:30
21:57 VAC Janos CER n Putting things away 22:27
Displaying report 1-1 of 1.