Reports until 22:15, Monday 01 July 2024
LHO General
ryan.short@LIGO.ORG - posted 22:15, Monday 01 July 2024 (78792)
Ops Eve Shift Summary

TITLE: 07/02 Eve Shift: 2300-0500 UTC (1600-2200 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Oli
SHIFT SUMMARY: High winds this evening have kept H1 down for the past 4 hours; gusts peaked around 45mph. Since they've calmed down a bit, I've started locking H1 and it's just reached ENGAGE_ASC_FOR_FULL_IFO.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:08 SAF LVEA LVEA YES LVEA IS LASER HAZARD Ongoing
01:29 CAL Francisco, Neil PCal Lab n Getting equipment 02:01