Displaying report 1-1 of 1.
Reports until 14:31, Thursday 26 September 2013
H1 INS
jim.warner@LIGO.ORG - posted 14:31, Thursday 26 September 2013 (7881)
BSC9 Cartridge has landed

Apollo (Bubba, Randy, Scott, Tyler), GregG, MitchR, JeffB, AndresR, JimW

After an earlyish start at 8am and an abbreviated lunch, the cartridge install wrapped up at 2pm. No major hitches beyond a somewhat "poofier" C3 wrap job than previous installs. This necessitated the removal of a cleanroom filter unit to allow the cartridge to clear. (Note: SUS covers need to their  bottoms clipped to the side (for maximum clearance), not bunched at the bottom, as is the usual practice). Otherwise very smooth. SUS and TMS should head in chamber next to inspect their systems.

Displaying report 1-1 of 1.