DriptaB, FranciscoL
After one week of having the inner beam up on the Rx sensor (alog 78807), on July 2, we moved the beam from up to center.
The last page of EndStationLog.pdf lists the voltage values after each significant step of procedure T2400163. The steps represent writing down a voltage value after a particular change to the beam position. Some highlights from the recorded values:
The 'Initial' measurement is *equal* to the last voltage measurement from the previous movement, done on June 25 (alog 78807). The initial and final voltage measurement during today procedure did not change.
Title should be "eight", not "seventh". This movement was a week after the seventh move, which was moved up (alog 78807).