TITLE: 07/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
Nitrogen truck came at 15:40 UTC
15:50 UTC Internet connection to outside networks went down.
16:04 UTC Internet was restored.
Water truck arrived.
PSL team Installed PMC in the PSL enclosure.
Concrete truck left at 19:45 UTC
Ryan S. and Jason come out of the PSL ~ 22:40 UTC.
IMC , PMC and the Rotation Stage Calibration and alignments must be.
Jenne and Sheila took care of the IMC & PMC and took the IFO to Locking Green arms to do so.
While they were working on X arm I requested Y arm to Increase Flashes to save some time.
To Do before Locking:
We have since started an Initial Alignment and we must wait for that to finish before the Rotation stage Calibration can be done because the IMC needs to be unlocked to make that happen.
To do the Rotation Stage Calibration follow the Bullet points found here:
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=76890
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:08 | SAF | LVEA | LVEA | YES | LVEA IS LASER HAZARD | 10:08 |
14:59 | FAC | Karen, Nelly | EY | N | Technical Cleaning | 15:40 |
15:00 | FAC | Kim | EX | N | Technical Cleaning | 16:01 |
15:05 | VAC | Gerardo, Isiah | LVEA | Yes | Function test on 3 turbo pumps WP11951 | 17:40 |
15:06 | PSL | Jason, Ryan S | PSL | YES | PSL work | 22:39 |
15:08 | eE | Fil, Mark | MSR | No | Replacing Server Rack Batteries. | 15:41 |
15:16 | FAC | Christina & Janos | LVEA | YES | Looking for Vacuum parts | 15:39 |
15:17 | PCAL | Dripta, Francisco | EX | YES | End X measurement & Beam Spot Move | 17:41 |
15:20 | FAC | Tyler & Contractors | HVAC/VPW, EX&Y, MXY VEAs | No | Replacement of Heat Pump | 21:20 |
15:27 | FAC | Chris Pest | LVEA, MS, ES | YES | Pest control | 16:41 |
15:39 | FAC | Christina | EY, FTCE, EX | No | Looking for cart | 16:24 |
15:41 | EE | Marc Fil | EX CSR | N | LD32 Channels | 16:11 |
15:43 | FAC | Mitchell | LVEA | YES | looking for 3FO parts | 15:57 |
15:48 | FAC | Karen & Nelly | HAM Shaq | No | Technical Cleaning | 16:29 |
15:58 | TCS | Camilla | LVEA | Yes | Looking for parts | 16:30 |
16:14 | SEI & FAC | Jim & Mitchell | EX & EY | N | Checking Dust pumps & Wind Fence. | 16:48 |
16:16 | PEM | Robert & Co | LVEA & Roof | YES | Checking Sensors | 18:12 |
16:17 | EE | Fil & Marc | LVEA SQZT0 | YES | Swapping out the Beat note Box | 16:33 |
16:30 | ASL/FIT | Camilla | INSIDE X arm | N | Running the Inside of the X arm to check the ALS fiber. | 17:31 |
16:31 | VAC | Janos & Jordan | Mid X& Y | N | Taking measurements | 17:12 |
16:42 | FAC | Chris | LVEA MY & EY | Yes | Various Famis Tasks around the LVEA | 18:25 |
16:49 | EE | Fernando | LVEA HighBay | Yes | taking pictures. | 17:29 |
16:53 | FAC | Nelly, Kim, Karen | LVEA | Yes | Technical Cleaning | 18:09 |
17:15 | SAFETY | Richard | EX | N | Picking Up Camilla | 17:42 |
17:42 | PCAL | Emanuel & Francisco | PCAL LAB | YES | PCAL measurements. | 18:12 |
18:19 | VAC | Janos | EY | N | Vacuum Measurments | 19:02 |
18:44 | PSL | Jenne | PSL Enclosure | YES | Helping the PSL team | 20:13 |
18:52 | CDS | Erik & Marc | EX | N | Swapping cables | 19:17 |
21:24 | Inventory | Christina & Mitchell | LVEA | Yes | Searching for equipment | 21:34 |
21:57 | PMC | Shiela | LVEA ISCT1 | Yes | PMC alignmnet adjustment | 22:57 |