TITLE: 07/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
The IFO has been unlocked all day due to a HAM2 DAC failure and for PSL and ALS adjustments left over from yesterday's maintenence.
The Beat note at End X was touched up by Jenne Camilla and Sheila. This started in the morning and ended shortly before 4.
We started an Initial Alignment, but got stuck in Find X arm IR.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:08 | SAF | LVEA | LVEA | YES | LVEA IS LASER HAZARD | 10:08 |
15:10 | FAC | Karen | Optics Lab | N | Technical cleaning | 15:46 |
15:33 | PSL | Jason & Jennie | PSL Enclosure | YES | Touching up alignment of ALS FC2 | 17:16 |
17:19 | PEM | Robert Carlos Milly | Along arm Y | No | Testing a Seismometer in the dirt | 20:19 |
17:21 | ISC | Richard | LVEA HAM6 | Yes | Checking out some racks near HAM6 | 17:31 |
17:24 | ASL | Jenne, Sheila, Camilla, Ollie | X Arm | Yes | Transitioning to LASER HAZARD to adjust ALS | 21:01 |
18:07 | PCAL | Karen & Francisco | PCAL Lab | Yes | Technical cleaning & escort. | 18:22 |
21:03 | ALS | Camilla | LVEA | Yes | Getting power meter | 21:22 |
21:14 | VAC | Gerardo | FTCE | N | Getting parts and checking Vacuum | 21:41 |
21:23 | ASL | Camilla, Jenne, Sheila | EX | Yes | Realigning ALS X fiber | 23:30 |
21:29 | CDS | Jonathan fil | CER | N | Unplugging cat 5 cables to restart cameras | 22:32 |
23:10 | PEM | Robert | LVEA | Yes | Setting up shaker | 23:30 |