Reports until 01:00, Thursday 04 July 2024
H1 General (SQZ)
ryan.crouch@LIGO.ORG - posted 01:00, Thursday 04 July 2024 (78850)
OPS Wednesday EVE shift summary

TITLE: 07/04 Eve Shift: 2300-0800 UTC (1600-0100 PST), all times posted in UTC
STATE of H1: Observing at 153Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

Lock1: ISS 2nd loop issues, possible EndX issues, and the classic input align issues

 

The SQZ-FIBR_TRANS_DC is just barely over the high power limit (Tagging SQZ)

I unmonitored the CSSQZ channel H1:SQZ-FIBR_LOCK_TEMPERATURECONTROLS_ON as it would periodically turn off and on at a high frequency without seemingly doing anything to the BEAT_FREQ, so this won't keep dropping us out of observing tonight

Images attached to this report