Reports until 16:18, Monday 08 July 2024
H1 General (Lockloss)
anthony.sanchez@LIGO.ORG - posted 16:18, Monday 08 July 2024 (78945)
Monday Ops Day Shift End

TITLE: 07/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

Internet went down 15:09 UTC for what seemed like less than a minute. Cause: Automatic Switching from Boise Connection to Seattle.
Lockloss 15:11 UTC due to an earthquake.
https://ldas-jobs.ligo-wa.caltech.edu/~lockloss/index.cgi?event=1404486684

We moved PR3 back to it's previous position while in Input_Align.
Sheila is touching up the COMM And DIFF beat notes.
17:14 UTC Earthquake passed through and was not announced.
Comissioning started at 17:16 UTC

Nominal_Low_Noise reached at 18:31 UTC.
Observing reached at 18:32 UTC

LOG:                                                

Start Time System Name Location Lazer_Haz Task Time End
16:08 SAF LVEA LVEA YES LVEA IS LASER HAZARD 10:08
15:02 FAC Tyler Water Tank N Moving truck over to water tank 15:12
15:28 FAC Karen Optics Lab & VAC Prep N Technical Cleaning 15:57
15:59 ISC Sheila ICST1 Yes Aligning COMM and DIFF BeatNotes 16:29
16:45 FAC Karen Mid Y N Technical Cleaning 17:45
16:53 FAC Kim Mid X N Technical Cleaning 17:42
17:26 SQZ Naoki Ctrl Rm N Testing SQZr 17:46
17:55 PCAL Francisco PCAL Lab Yes PCAL Lab Upgrades 20:59
18:12 PRCL Camilla CRTL Rm N PRCL Measurement 18:22
18:20 OMC Naoki Ctrl Rm N Exciting OMC 18:24
18:25 SUS Josh Ctrl Rm N osem measurements 18:30