patrick.thomas@LIGO.ORG - posted 17:01, Friday 27 September 2013 (7896)
Ops Summary (PM)
12:00 Thomas V. out of the LVEA, to return later
12:14 I increased the dust alarm levels at end Y location 1 to conditions outside of a clean room
13:01 Dave B. and Jim B. to end Y
13:33 Dave B. power cycling ISCEY to fix an IPC error
13:56 Jim B. trying to start h1susey
14:10 Jim B. trying to start h1susauxey
14:16 Jim B. and Dave B. to end Y to swap the cabling between the sus and susaux frontends and their chassis. (sus was going to susaux, susaux was going to sus)
14:51 fw1 has stopped writing frames, Dave B., Jim B., Cyrus R. and Dan M. investigating
15:52 Cheryl V. and Paul F. done working in H1 PSL laser room on isolation measurements

High dust count spike at .3 microns in H1 PSL diode room, investigated, lights off, nobody responded
Hugo P. waiting for work to complete in HAM1 to start MC measurements
Filiberto C. done with SUS and SEI field cabling at end X