12:00 Thomas V. out of the LVEA, to return later 12:14 I increased the dust alarm levels at end Y location 1 to conditions outside of a clean room 13:01 Dave B. and Jim B. to end Y 13:33 Dave B. power cycling ISCEY to fix an IPC error 13:56 Jim B. trying to start h1susey 14:10 Jim B. trying to start h1susauxey 14:16 Jim B. and Dave B. to end Y to swap the cabling between the sus and susaux frontends and their chassis. (sus was going to susaux, susaux was going to sus) 14:51 fw1 has stopped writing frames, Dave B., Jim B., Cyrus R. and Dan M. investigating 15:52 Cheryl V. and Paul F. done working in H1 PSL laser room on isolation measurements High dust count spike at .3 microns in H1 PSL diode room, investigated, lights off, nobody responded Hugo P. waiting for work to complete in HAM1 to start MC measurements Filiberto C. done with SUS and SEI field cabling at end X