ibrahim.abouelfettouh@LIGO.ORG - posted 16:38, Wednesday 17 July 2024 (79200)
OPS Day Shift Summary

TITLE: 07/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 17mph Gusts, 13mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.08 μm/s
QUICK SUMMARY:

IFO is DOWN and in CORRECTIVE MAINTENANCE - VENTING

With maximum sarcasm, I report that it's been a slow day. Here's a rough rundown:

The vent plan can be found at E2400260

Other:

EY Intelli-site network down (Fil contacting contractors)

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

Start Time System Name Location Lazer_Haz Task Time End
14:58 FAC Kim, Nelly LVEA N Technical Cleaning in prep for vent 19:14
14:58 FAC Karen Optics Lab, Vac Prep Lab N Technical Cleaning 15:13
15:20 FAC Chris LVEA N Tech cleaning tops of HAM 5,6,7 16:57
15:39 FAC Tyler, Erik FCES, LVEA N Forklift from FCES to HAM5, 6 16:39
15:39 FAC Richard LVEA N Checking on Vent Prep Work 15:42
15:48 EE Fil EY N Network Access Work 16:48
17:35 sus corey cr - ZM6.OM2 TFs 21:24
18:33 VAC Travis, Jordan LVEA N Gate Valves 19:33
18:34 VAC Janos LVEA N Gate Valves 19:34
18:34 OPS TJ LVEA N Parts check 19:14
20:53 EE Fil LVEA N Turning High Voltage Off 21:26
20:54 VAC Travis, Jordan LVEA N Viewport Checks 20:54
21:02 VAC Janos, Travis, Jordan LVEA N Closing Gate Valve 5 22:02
21:18 EE Fil MY N Drop off part 22:18
21:35 FAC Chris Lvea N HAM7 21:35
22:55 AOS TJ Optics Lab N Gathering AUX Optics 23:55