TITLE: 07/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 17mph Gusts, 13mph 5min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.08 μm/s
QUICK SUMMARY:
IFO is DOWN and in CORRECTIVE MAINTENANCE - VENTING
With maximum sarcasm, I report that it's been a slow day. Here's a rough rundown:
The vent plan can be found at E2400260
Other:
EY Intelli-site network down (Fil contacting contractors)
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:58 | FAC | Kim, Nelly | LVEA | N | Technical Cleaning in prep for vent | 19:14 |
| 14:58 | FAC | Karen | Optics Lab, Vac Prep Lab | N | Technical Cleaning | 15:13 |
| 15:20 | FAC | Chris | LVEA | N | Tech cleaning tops of HAM 5,6,7 | 16:57 |
| 15:39 | FAC | Tyler, Erik | FCES, LVEA | N | Forklift from FCES to HAM5, 6 | 16:39 |
| 15:39 | FAC | Richard | LVEA | N | Checking on Vent Prep Work | 15:42 |
| 15:48 | EE | Fil | EY | N | Network Access Work | 16:48 |
| 17:35 | sus | corey | cr | - | ZM6.OM2 TFs | 21:24 |
| 18:33 | VAC | Travis, Jordan | LVEA | N | Gate Valves | 19:33 |
| 18:34 | VAC | Janos | LVEA | N | Gate Valves | 19:34 |
| 18:34 | OPS | TJ | LVEA | N | Parts check | 19:14 |
| 20:53 | EE | Fil | LVEA | N | Turning High Voltage Off | 21:26 |
| 20:54 | VAC | Travis, Jordan | LVEA | N | Viewport Checks | 20:54 |
| 21:02 | VAC | Janos, Travis, Jordan | LVEA | N | Closing Gate Valve 5 | 22:02 |
| 21:18 | EE | Fil | MY | N | Drop off part | 22:18 |
| 21:35 | FAC | Chris | Lvea | N | HAM7 | 21:35 |
| 22:55 | AOS | TJ | Optics Lab | N | Gathering AUX Optics | 23:55 |