ibrahim.abouelfettouh@LIGO.ORG - posted 16:34, Thursday 18 July 2024 (79226)
OPS Day Shift Summary

TITLE: 07/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

IFO is in CORRECTIVE MAINTENANCE for VENTING

Productive day where we found the culprit (yet to be seen if there are more) to our OFI issues in the form of a burn on the KTP Optic of the OFI (alog 79223). After this point, there were impromptu meetings discussing how to proceed. A slight shift of priorities was announced and the check-list is as follows (E2400260):

WED JULY 17

  1. ✅ Check that after HEPI locking SQZ and single bounce beams both go to AS_C, find SRM and SR2 slider values to simulate alignments from early April and from June.
  2. ✅ Check ITM OPLEVs
  3. ✅ Close GV1,2sheila.d, FC tube GVs
  4. ✅ Vent Corner, HI Volts on/off, see their M-doc. Full laser Safe transition. 

THUR JULY 18

  1. ✅ Vent and Remove Relay tube
  2. ✅ Remove Cameras from HAM6 door (alog 79213)
  3. ✅ Open HAM5 via  +X DOOR
  4. ✅ Open HAM6 via  +X DOOR
  5. ✅ Vent HAM7
  6. ✅ HI VOLT BYPASS back on (alog 79222)
  7. ✅ Remove HAM5 -X DOOR
  8. H6 - Initial inspection of OM1, Refl Beam dump, cables, PDs, beam dumps, etc
  9. H5 - Lock ISI
  10. H5 - Remove OFI Black glass panel shroud pieces from at least +X side and roof.  TAKE CARE TO INVESTIGATE any clipping or anything out of nominal.

FRI JULY 19

  1. Remove HAM6 -X DOOR
  2. H6 - Lock ISI
  3. Pull CC wafers reachable in both chambers
  4. H5 - Initial inspection of OFI and SRM optic surfaces, cables, beam dumps, etc
  5. FTIR sample XX areas on table and around any damage areas (5 sample vials).
  6. H5 - Transition to Laser Haz
  7. Setup AUX laser systems, prioritize HAM5 alignment laser 
  8. Using SQZ beam delivered from HAM7, make OFI Measurements in-situ:
    1. Measure loss after each component inc. SRM with power meter. 
  9. Transition back to Safe when done.

Aditionally, all TFs for pe-vent suspensions have submitted ALL_TF and comparison TF reports as comments to their initial alogs: alog 79189, alog 79188, alog 79198, alog 79202

These plans are of course tentative and depend on ongoing decisions in this living (and breathing) document. Well done to the quick, efficient and safe vent crew!

THIS JUST IN: Approximately 3s before hitting enter, the vent crew came back with more pictures of backsplashed debris from the two burn spots in the OFI. Stay tuned for more (alogs).

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:48 FAC Karen, Kim LVEA N Technical Cleaning 15:48
15:53 EE Fil, Camilla LVEA N Pulling off HAM6 Cameras 16:53
16:10 FAC Chris, Eric HAM6 N Breaking torque on HAM6 Door Bolts 19:20
16:12 FAC McCarthy HAM6 N Ensuring Safety during door work 18:12
16:14 FAC Bubba G EX & EY N Resuppling First Aid Kits 17:26
16:16 VAC Jordan, Tyler HAM6 N HAM6 Door Bolt Torque breaking 19:38
16:18 VAC Travis, Gerardo LVEA N Relay tube VAC work & HAM6 Door crew work. Travis out 19:15UTC 19:31
16:31 FAC Tyler FCES N Camera Acquisition 16:52
16:33 VAC Jason LVEA N Aux lasers for LVEA vent team 16:42
16:44 EE Keita LVEA N Fil BNC Cable HAM6 17:10
16:57 FAC Kim, Karen LVEA N Technical Cleaning 17:57
16:58 FAC Fil LVEA N Interlock 17:58
17:11 SQZ Keita, Jennie Optics lab Local Work on HAM5/6 laser 19:38
17:23 SQZ Camilla Optics lab Local Check if team has all the parts they need 18:40
17:45 CAL Tony PCAL lab LOCAL Gather stuff 18:03
18:41 SQZ TJ Optics Lab Local Part search Part 2 19:08
18:41 FAC Richard LVEA N Supervision 19:01
18:42 PCAL Rick, Guest LVEA N Walking Tour 19:20
19:05   Betsy LVEA N Check on crew 19:25
19:39 EE Fil CER N ISI WD Cable Reset 20:28
19:43 PCAL Rick, Dripta, Emmanuel, Shingo, Dan EY YES PCAL Measurements 21:54
20:23 FAC Tyler LVEA N HAM5 -X Door Removal Prep 21:51
20:28 VAC Chris, Jordan, Travis LVEA N HAM5 -X Door Removal 21:51
21:32 SUS Mitchell, Betsy, TJ, Sheila LVEA N HAM5 Door + OFI 23:32
22:26   Oli LVEA N Parts dropoff 22:30
22:42   Ibrahim LVEA N Sensor calibration 22:45
23:28 PCAL Tony, Emmanuel PCAL Lab Local LHO PS4 PS5 Measurement 00:28