Reports until 07:43, Monday 22 July 2024
H1 General (PSL)
anthony.sanchez@LIGO.ORG - posted 07:43, Monday 22 July 2024 (79260)
Monday Ops Day Shift Start

TITLE: 07/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 10mph Gusts, 7mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.07 μm/s
QUICK SUMMARY:

Verbals has a Check PSL Chiller alert from 14:22 UTC

IFO currently down for OFI maintenance. 


Expected work today:

H6 - Continue inspection of WFS and shutter (take photo with fast shutter up).
Start setup AUX laser systems, prioritize HAM5 alignment laser

Confirm pointing still retained settings, oplev.
Using SQZ beam delivered from HAM7, make OFI Measurements in-situ:
Measure loss after each component inc. SRM with power meter.
Get Danny signoff on updated AUX SOP
Finish Setup AUX laser system in HAM5, use SR
Group mtg to determine OFI optic swap order of operations.