Reports until 16:37, Wednesday 24 July 2024
H1 General
oli.patane@LIGO.ORG - posted 16:37, Wednesday 24 July 2024 (79305)
Ops Day Shift End

TITLE: 07/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY: The OFI team was able to get the AUX laser aligned and verified that the SQZ beam can get to OM1. Tomorrow morning first thing we will be transitioning the LVEA to laser safe and continuing the OFI work by taking the KTP out and taking the HAM6 -X door off.
LOG:

- Continuing work on aligning AUX laser

- Aligning sqz beam

- Getting ready to transition to laser safe

Start Time System Name Location Lazer_Haz Task Time End
15:11 FAC Kim, Karen LVEA YES Tech clean, (Karen out at 1600) 16:23
15:20 VAC Jordan LVEA YES Checking purge air 15:31
15:41 OFI Camilla, Jason, Sheila HAM5 Y AUX laser work 19:41
16:10 OFI Keita LVEA YES OFI work 19:41
16:11 FAC Richard LVEA YES Checking in on OFI work 17:34
16:38 FAC Karen WoodShop n Tech clean 17:27
17:25 FAC Kim MX n Tech clean 18:27
18:09 FAC Karen EY n Tech clean 18:58
18:28 OFI Francisco LVEA YES Helping with OFI 19:41
19:12 ISI Jim EY n Recovering EY from HEPI/ISI trip 19:46
19:15   Richard LVEA YES Checking in on OFI peeps 19:41
20:41 OFI Camilla LVEA YES More AUX aligning for OFI 23:30
20:50 OFI Jenne, Naoki, Sheila, Jason LVEA YES Continue AUX alignment work for OFI (Sheila, Jenne out 22:55)(Naoki our 23:08)(Jason out 23:27) 23:27
21:51 VAC Gerardo LVEA YES Purge air for HAM7 22:02
21:29 VAC Janos EY n Purge air photos 21:48
21:49 FAC Tyler LVEA YES Prepping for HAM6 door removal 21:52
22:10 OFI Keita LVEA YES OFI help 22:55
23:08 EE Marc, Fil MY n Looking for parts ongoing
23:09 FAC Tyler LVEA YES More prep work for HAM6 door 23:13