Reports until 16:29, Friday 26 July 2024
H1 General
ryan.crouch@LIGO.ORG - posted 16:29, Friday 26 July 2024 (79328)
OPS Friday day shift summary

TITLE: 07/26 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Tony
SHIFT SUMMARY: More KTP work in the optics lab, the wedge broke during work today but we have a spare. The LVEA remains in SAFE.
LOG:                                                                                                                                                                                                                                                                                                                                                                

Start Time System Name Location Lazer_Haz Task Time End
15:08 SQZ Sheila Optics lab LOCAL KTP work 16:55
15:39 PEM Robert, Carlos, Milly Yarm N PEM investigations 19:09
15:50 SQZ Keita Optics lab LOCAL Join Sheila, KTP work 17:53
16:06 CAL Fransisco, Cervane PCAL lab LOCAL PCAL work 16:24
16:35 VAC Janos EndX N Turn on air supply for the day 17:35
16:39 VAC Jordan LVEA N Purge air / Dew point checks 16:59
17:07 SQZ Sheila Optics lab LOCAL KTP 17:53
18:18 VAC Jordan Ham6 N RGA 18:51
19:47 SQZ Sheila, Keita Optics lab LOCAL KTP work 22:52
21:01 VAC Jordan Ham6 N More RGA 21:57
21:12 PEM Robert, Milly, Carlos, Neil Yarm, Site N PEM investigation 23:23
23:22 CAL Francisco PCAL lab LOCAL PCAL work Ongoing