TITLE: 07/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY: This morning the fused silica piece for the OFI was installed, and afterwords the LVEA was transitioned to Laser HAZARD for alignment checks and to set up for an isolation measurement.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:56 | FAC | Karen, Kim | LVEA | n | Technical cleaning | 15:36 |
14:59 | FAC | Tyler | MY | n | Checking fire alarm | 15:12 |
15:06 | PCAL | Tony | PCAL Lab | YES | Prep for EX measurement | 15:57 |
15:19 | VAC | Fil | FCES | n | VAC wiring updates | 16:05 |
15:26 | ISC | Camilla, Keita, Sheila | LVEA | n | FS install | 17:23 |
15:32 | VAC | Gerardo | LVEA | n | Check on purge air | 15:48 |
15:33 | FAC | Kim, Karen, Nelly | FCES | n | Technical cleaning | 16:42 |
16:10 | PCAL | Tony, Cervane | EX | YES | PCal measurement | 19:12 |
16:27 | FAC | Kim | EX | - | Technical cleaning | 17:36 |
16:28 | FAC | Karen | MY | n | Technical cleaning | 17:36 |
16:28 | VAC | Travis | LVEA | n | Check on turbopump | 16:42 |
16:47 | FAC | Nelly | EY | n | Technical cleaning | 17:36 |
17:06 | OPS | Oli | LVEA | YES | Laser HAZARD transition | 17:23 |
17:22 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | Ongoing |
17:23 | ISC | Keita, Camilla, Jennie, Sheila | LVEA | YES | FS install and alignment | 19:25 |
17:35 | 3IFO | Tyler | MX, MY | n | 3IFO checks | 17:56 |
17:53 | OPS | Oli | LVEA | - | Parts delivery | 18:00 |
18:36 | SEI | Jim | FCES | n | Checking HAM8 CPSs | 20:59 |
19:14 | PCAL | Tony, Cervane | PCal Lab | YES | Putting away equipment | 19:17 |
19:45 | FAC | Eric | FCES | n | Air handler work | 21:43 |
20:18 | ISC | Sheila, Betsy, Jennie, Keita | LVEA | YES | OFI isolation measurement (Sheila out @ 22:55) | Ongoing |
23:02 | PCAL | Tony | PCal Lab | YES | Getting equipment | 23:07 |