STATE of H1: Corrective Maintenance
SHIFT SUMMARY: This morning the fused silica piece for the OFI was installed, and afterwords the LVEA was transitioned to Laser HAZARD for alignment checks and to set up for an isolation measurement.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:56 FAC Karen, Kim LVEA n Technical cleaning 15:36
14:59 FAC Tyler MY n Checking fire alarm 15:12
15:06 PCAL Tony PCAL Lab YES Prep for EX measurement 15:57
15:19 VAC Fil FCES n VAC wiring updates 16:05
15:26 ISC Camilla, Keita, Sheila LVEA n FS install 17:23
15:32 VAC Gerardo LVEA n Check on purge air 15:48
15:33 FAC Kim, Karen, Nelly FCES n Technical cleaning 16:42
16:10 PCAL Tony, Cervane EX YES PCal measurement 19:12
16:27 FAC Kim EX - Technical cleaning 17:36
16:28 FAC Karen MY n Technical cleaning 17:36
16:28 VAC Travis LVEA n Check on turbopump 16:42
16:47 FAC Nelly EY n Technical cleaning 17:36
17:06 OPS Oli LVEA YES Laser HAZARD transition 17:23
17:22 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD Ongoing
17:23 ISC Keita, Camilla, Jennie, Sheila LVEA YES FS install and alignment 19:25
17:35 3IFO Tyler MX, MY n 3IFO checks 17:56
17:53 OPS Oli LVEA - Parts delivery 18:00
18:36 SEI Jim FCES n Checking HAM8 CPSs 20:59
19:14 PCAL Tony, Cervane PCal Lab YES Putting away equipment 19:17
19:45 FAC Eric FCES n Air handler work 21:43
20:18 ISC Sheila, Betsy, Jennie, Keita LVEA YES OFI isolation measurement (Sheila out @ 22:55) Ongoing
23:02 PCAL Tony PCal Lab YES Getting equipment 23:07