anthony.sanchez@LIGO.ORG - posted 16:58, Wednesday 31 July 2024 (79391)
Wednesday Ops Shift End

TITLE: 07/31 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY:
I know that there have been a lot of Laser trasitions done today...
But

The LVEA IS  currently in LASER SAFE.

OFI work has continued all day :

  1. ✅Measure Isolation - new simpler plan suggestion from LLO (cube between SRM and OFI…)  Backup - Need Aux laser in HAM6 as LLO#58791, 58848
    1. If out of spec, adjust TGG crystal location (slots in mount)
  2. ✅ Inspect/deal with beam dumps if not done already
  3. ✅Squeeze beam alignment Check, AS and WFS
  4. ✅Check OFI rejected PD path alog59906 KPT fwd rejected (use WP before OFI)

 

Before closeout 

  1. ✅ Robert in-chamber pictures
  2. ✅Finish testing Fast Shutter, trigger HV
  3. See HAM6 closeout checklist
  4. ✅ Correct OFI osem magnet(s)
  5. ✅ Rebalance  OFI
  6. Reinstall OFI Glass shroud
  7. ✅ Re Check AS and WFS (Not checking WFS)
  8. ✅ Turn on laser for final alignment check 
  9. ✅ Remove all retro reflector, iris and AUX laser parts
  10. Unlock ISI ( Jim is unlocking HAM5 but not HAM6)




LOG:

Start Time System Name Location Lazer_Haz Task Time End
17:22 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD 20:01
14:32 FAC Eric FTCE No Working on Air Handler 14:52
15:03 FAC Kim & Karen LVEA LASER Hazard Technical Cleaning Kim out first 15:53
15:16 VAC Gerardo LVEA yes Dew Point measurements. 15:26
15:29 OFI Sheila & Betsy LVEA Yes Isolation ratio measurements, Betsy out first 19:30
15:49 PCAL Francisco PCAL Lab Yes PCAL PS45 measurement 16:49
15:55 OFI Camilla, Keita Optics lab & LVEA Yes Getting parts and helping the HAM5,6 crew 19:16
16:10 PEM Robert,  Milly, Carlos End X N Testing PEM equipment 20:01
16:18 FAC Karen Mid Y N Dropping off supplies/ technical cleaning. 17:04
17:04 EE Fil & Richard LVEA Yes Checking on HAM5 17:04
17:47 VAC Gerardo Relay tube Yes Relay tube valve open 17:48
18:52 EPO Amber +10 Ctrl Rm & Overpass n Tour 18:52
19:29 SAF Oli & Ibrihim LVEA Yes LASER Transition to safe. 19:54
20:01 OFI Rahul & Betsy LVEA No SUS OFI work,  Rahul out first 00:19
20:23 VAC Gerardo LVEA No Isolating HAM7 21:03
20:28 Staff Tour Jenne + 15 LVEA No Checking out the HAM5 & 6 Chamber. 21:12
21:29 PCAL Francisco PCAL Lab yes Checking Config 21:39
21:59 SAFE Sheila LVEA Yes LASER HAZARD Transition 22:26
22:06 OFI Camilla LVEA Yes Working on OFI with Sheila 23:45
22:49 SAFE Ryan C. LVEA Yes Laser  Transition 23:19
23:19 VAC Janos HAM8 N Checking Vacuum system 23:59
23:36 SEI Jim HAM5 N Seismic system checks 01:36
23:44 SAF LAZER SAFE LVEA YES THE LVEA IS LASER SAFE :) 22:24
23:48 OFI Richard LVEA N Checking on the Status of OFI crew 00:48

 