Reports until 16:38, Friday 06 May 2011
H2 INS
greg.grabeel@LIGO.ORG - posted 16:38, Friday 06 May 2011 (794)
BSC 4 HEPI Install

Finished attaching the support brackets on BSC 4. The old iLIGO stack on the SE corner was cleared out. The SE pier is far enough out of center from the crossbeam that the HEPI frame would have interfered with the side clamp. Another hole was drilled to allow the clamp clearance (photo 1).

Images attached to this report