TITLE: 08/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY: Today's work was mostly lots of final checks/cleaning before we can close the enclosures. Doors are not on, but HAM6 TFs show that we are good to go(SUS, SEI), and we are having problems with one of the OSEMs on SRM M1 on HAM5, so we'll be looking at that more tomorrow.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:07 | FAC | Karen | LVEA | n | Tech clean | 16:04 |
15:08 | FAC | Kim | LVEA | n | Tech clean | 15:33 |
15:14 | VAC | Gerardo | LVEA | n | Checking on purge air | 15:37 |
15:33 | FAC | Eric | EY | n | Chiller tasks | 15:46 |
15:33 | Rahul | LVEA | n | Checking with Gerardo about purge air | 15:34 | |
16:01 | FAC | Tyler | MY, EY | n | Ladder inspections | 17:22 |
16:18 | FAC | Chris | EY, EX | n | Filter work in mech room | 17:06 |
16:20 | SUS | Rahul | Remote | n | Taking HAM6 SUS TFs | 17:15 |
16:39 | FAC | Karen, Francisco | PCAL Lab | yes(local) | Tech clean | 16:53 |
16:56 | OFI | Betsy, Mitchell | LVEA | n | HAM5 finishing up work | 19:09 |
17:03 | VAC | Travis | LVEA | n | Adjusting purge air | 17:23 |
17:07 | PEM | Robert, Millie, Carlos | EX | n | Moving seismometers into EX | 17:35 |
17:09 | FAC | Karen | LVEA | n | Tech clean | 18:30 |
17:09 | FAC | Kim | LVEA | n | Tech clean | 18:30 |
17:18 | EE | Fil | LVEA | n | Grounding checks for HAM5/6 | 19:12 |
18:03 | Sheila, Mattia | LVEA | n | looking into the HAMs (started 17:30) | 18:03 | |
18:10 | OFI | Jeff | LVEA | n | Figuring out HAM grounding issues | 19:18 |
18:16 | OFI | Keita | LVEA | n | Checking in on OFI team | 19:07 |
18:32 | ISI | Jim | LVEA | n | ISI | 19:12 |
18:43 | SUS | Ibrahim | LVEA | n | Collecting SUS(picious) parts | 19:14 |
19:11 | FAC | Travis + Norco guy | MX, EX, MY, EY | n | Doing repairs | 20:28 |
19:16 | OFI | Betsy | LVEA | n | Helping Jeff | 20:04 |
19:26 | PEM | Robert, Sam | LVEA | n | Looking at sound equipment | 20:48 |
19:28 | VAC | Gerardo | LVEA | n | Adjusting purge air | 19:31 |
20:05 | CDS | Dave, Jonathan | LVEA | n | CDS LVEA sweep | 21:08 |
20:31 | CDS | Tony | LVEA | n | Setting up PSL nuc outside PSL enclosure | 21:08 |
20:36 | SUS | Rahul, Jeff | LVEA | n | Checking EQ stops in HAM5 | 21:23 |
20:56 | SUS | Ibrahim | LVEA | n | Dropping off dental mirror | 20:57 |
20:58 | OFI | Betsy | LVEA | n | Helping with OFI stuff | 21:23 |
21:33 | OFI | Fil | LVEA | n | Cleaning up | 22:02 |
21:51 | Camilla | LVEA, OpticsLab | n | Cleaning rampage | 23:42 | |
22:06 | EE | Rahul, Fil | LVEA | n | Investigating I/O issue at HAM5 | 22:28 |
22:31 | Ibrahim, Fil | LVEA | n | Cleaning up | 22:42 |