TITLE: 08/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Pump down of the corner volume continues. Les Guthman and his film crew were in the Control Room to conduct staff interviews for a good chunk of the shift.
LOG:
- 1438-1443 Out to continue Corner volume pump down (janos)
- 1610-1622 Quick check of pump status (janos)
- 1841 Back to check on pump status (janos)
- 2134 Another trip out to check on pump status (janos, travis, gerardo)
- 1446-1536 Technical cleaning: LVEA (karen,kim)
- 1558-1700 MX (kim)
- 1600-1746 optics lab (karen)
- 1830 woodshop (karen)
- 1454-1504 TCS Chiller level checks (corey)
- 1600 Guthman film crew arriving on-site
- Van arrived, but did not receive phone call at Ops Station (Tony picked up phone in Fellows area though)---Gate call-in to the Ops phone appear to not be getting through (phone receives phone calls OK)
- 1638 setting up in the Control Room
- 1616-1622 Looking for camera part in Filter Cavity Enclosure (ryanC escorting)
- Gate call-in to the Ops phone appear to not be getting through (phone receives phone calls OK)
- 1640 Dave adjusted the new air pressure scope to make it easier to see on nuc28
- 1730-2138 Film crew in Control Room
- 1842 Rick tour in lvea
- 1859-1915 PSL fixing of HVAC, dustmonitor, and turning off lights (jason)
- FYI: Dustmonitor PSL-102 still shows up as "not working" :(
- 1910 Twin City Metals picking up metal (bubba)
- 1940-2009 Accelerometer search in lvea around HAM5 & 6 (genevieve)
- 1957 Janos will escort genevieve around the area
- 2230-2243 Parts search at FC End Station (travis, janos)