The bake for the RGA on the end door for HAM6 has started, turned on at 16:00 utc.
RGA system at 150 oC, cal leaks are open, time start 00:01:00 utc 08/14/2024.
RGA system at 150 oC, cal leaks are open, time start 00:01:00 utc 08/14/2024.