Reports until 16:30, Tuesday 13 August 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:30, Tuesday 13 August 2024 (79538)
Ops Day Shift End

TITLE: 08/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
SHIFT SUMMARY: Light maintenace today while we continue to pump down. One DAQ restart for CAL model updates, and some other work around the site.
LOG:                                                                                                                                                                                                                                                                                                     

Start Time System Name Location Lazer_Haz Task Time End
14:37 ISC Corey LVEA n ISC table enclosure checks 15:16
15:15 PCAL Tony, Dripta PCAL lab local prep meas 15:22
15:16 ISC Corey EY, EX n ISC table enclosure checks 15:49
15:18 CDS/PSL Fil, Jason LVEA n Glitch hunting at PSL racks 17:51
15:20 FAC Karen, Kim, Nellie FCTE n Tube cleaning 17:51
15:23 PCAL Tony, Dripta EY Yes PCAL measurement 18:00
15:37 VAC Gerardo LVEA n Open HAM7 ion pump 17:33
15:46 CAL+DAQ Dave remote n New h1calcs model, DAQ restart 19:31
17:03 CDS Marc CER, EX,MX,MY,EY n Power supply checks 18:08
17:14 CDS/PSL Richard LVEA n Check in with Fil and Jason 17:33
17:16 VAC Gerardo FCES,FCTE n Leak detector move 19:04
18:03 REC Christina OSB Receiving n Throwing stuff in the recycling bin w/ forklift 19:33
18:08 - Mike, tour LVEA n Tour 19:08
20:07 FAC Chris LVEA n Grabbing barrel 20:37
20:41 PEM Genevieve, Sam LVEA n Moving an accelerometer around 22:16
20:44 CDS Dave CER n Check EY HWWD 21:14
20:45 VAC Janos LVEA n Checking pumps 21:45
22:41 VAC Gerardo LVEA n HAM6 RGA bake temp increase 22:53
Images attached to this report