TITLE: 08/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
SHIFT SUMMARY: Light maintenace today while we continue to pump down. One DAQ restart for CAL model updates, and some other work around the site.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:37 | ISC | Corey | LVEA | n | ISC table enclosure checks | 15:16 |
15:15 | PCAL | Tony, Dripta | PCAL lab | local | prep meas | 15:22 |
15:16 | ISC | Corey | EY, EX | n | ISC table enclosure checks | 15:49 |
15:18 | CDS/PSL | Fil, Jason | LVEA | n | Glitch hunting at PSL racks | 17:51 |
15:20 | FAC | Karen, Kim, Nellie | FCTE | n | Tube cleaning | 17:51 |
15:23 | PCAL | Tony, Dripta | EY | Yes | PCAL measurement | 18:00 |
15:37 | VAC | Gerardo | LVEA | n | Open HAM7 ion pump | 17:33 |
15:46 | CAL+DAQ | Dave | remote | n | New h1calcs model, DAQ restart | 19:31 |
17:03 | CDS | Marc | CER, EX,MX,MY,EY | n | Power supply checks | 18:08 |
17:14 | CDS/PSL | Richard | LVEA | n | Check in with Fil and Jason | 17:33 |
17:16 | VAC | Gerardo | FCES,FCTE | n | Leak detector move | 19:04 |
18:03 | REC | Christina | OSB Receiving | n | Throwing stuff in the recycling bin w/ forklift | 19:33 |
18:08 | - | Mike, tour | LVEA | n | Tour | 19:08 |
20:07 | FAC | Chris | LVEA | n | Grabbing barrel | 20:37 |
20:41 | PEM | Genevieve, Sam | LVEA | n | Moving an accelerometer around | 22:16 |
20:44 | CDS | Dave | CER | n | Check EY HWWD | 21:14 |
20:45 | VAC | Janos | LVEA | n | Checking pumps | 21:45 |
22:41 | VAC | Gerardo | LVEA | n | HAM6 RGA bake temp increase | 22:53 |