Reports until 16:33, Wednesday 14 August 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:33, Wednesday 14 August 2024 (79547)
Ops Day Shift End

TITLE: 08/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY:  The pump down continues (5e-7).
LOG:                              

Start Time System Name Location Lazer_Haz Task Time End
15:24 FAC Karen LVEA n Tech clean 16:32
16:00 FAC Kim LVEA n Tech clean 16:15
16:01 FAC Nellie HAM Shack n Tech clean 17:01
16:17 FAC Karen EY n Tech clean 18:17
16:33 FAC Kim EX n Tech clean 17:57
16:40 VAC Gerardo LVEA n HAM5/6 work with RGA and pump 17:52
17:47 VAC Janos LVEA n Walkabout 17:54
17:52 VAC Gerardo EX n Cart hunt 18:35
17:56 FAC Karen MY n Tech clean 18:35
17:58 FAC Kim H2 WH n Tech clean 18:34
18:35 - Camilla, Detchar (8) LVEA n Tour 19:18
20:10 VAC Chris LVEA n Grab straps for bake ovens 20:16
20:19 VAC Janos, Gerardo, Travis Opt lab n Viewport inspection 21:16
21:43 TCS Camilla Opt Lab Local Cheeta testing

ongoing

21:49 CDS Marc MY n Looking for parts 22:20
21:49 VAC Chris LVEA n Putting straps back 22:09