H1 General
oli.patane@LIGO.ORG - posted 16:55, Monday 19 August 2024 (79598)
Ops Day Shift End

TITLE: 08/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Tony-ish
SHIFT SUMMARY:  HAM5 and 6 got unlocked today.
LOG:

14:30 In Corrective maintanence
16:00 HAM5/6 HEPI unlocked                                                                                                                                                                            

Start Time System Name Location Lazer_Haz Task Time End
15:18 VAC Jordan LVEA n Pump checks 15:28
15:23 FAC Karen, Kim LVEA n Tech clean 16:20
15:52 SEI Jim LVEA n Unlocking HAM5/6 16:20
16:52 FAC Karen EY n Tech clean 17:31
19:35 FAC Kim LVEA Receiving n Moving stuff 19:57
19:45 VAC Janos LVEA n Replacing gauge 19:57
20:22 SEI Jim, Mitchell LVEA n Taking HEPI pump stations down 21:32
20:40 PSL RyanS, Fil CR,LVEA n Shutting down PSL to get rid of comb 21:04
20:53 VAC Jordan, Travis, Gerardo LVEA n Swapping gauge (Travis out 22:34) 22:40
20:59 VAC Janos LVEA n Helping swap gauge 22:28
21:09 PEM Genevieve, Sam EX, EY n Taking photos o fPEM equipment 22:42
23:10 PCAL Francisco, Miriam EX YES Transitioning to LasHaz & centering beam spot for tomorrow ongoing