LHO General
ryan.short@LIGO.ORG - posted 16:32, Tuesday 20 August 2024 (79612)
Ops Day Shift Summary

TITLE: 08/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
SHIFT SUMMARY: Just some light maintenance activities today as pumpdown continues. HAM5/6 HEPIs were locked so VAC team could valve out the turbopump on top of HAM6.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:41 CDS Erik CR n Restarting Picket Fence 14:48
15:30 FAC Nelly FCES n Technical cleaning 16:22
15:40 CAL Dave remote n restart h1calcs 17:15
15:40 DAQ Dave remote n Restart NDS1 17:15
15:42 FAC Karen LVEA n Technical cleaning 17:10
15:50 FAC Kim EX n Technical cleaning 16:49
16:14 PEM Genevieve, Sam MY n Checking access 16:30
16:23 FAC Tyler, Eric LVEA n Moving cabinets 17:01
16:42 OPS RyanC LVEA n Restarting dust monitor 16:50
16:45 PSL RyanS CR n FSS RefCav alignment 17:59
16:49 FAC Kim LVEA n Technical cleaning 17:50
16:58 VAC Jordan MY, EY n Turbopump check 19:15
16:59 VAC Travis MX, EX n Turbopump check 19:46
17:10 FAC Karen MY n Technical cleaning 18:16
17:14 FAC Richard LVEA n Safety walkabout 17:31
17:52 ISC Elenna CR n IM transfer functions 18:49
17:59 FAC Kim MX n Technical cleaning 18:51
18:33 VAC Janos LVEA n VAC checks 18:41
19:42 SEI Jim, Mitchell, Ibrahim LVEA n Locking HAM5/6 HEPI 19:58
20:08 PEM Genevieve, Sam MX, EX, MY, EY n Taking pictures of PEM equipment 21:43
20:38 VAC Janos, Jordan, Gerardo LVEA n VAC checks 21:38
22:04 PEM Robert, Genevieve, Sam EBay n PEM things 22:27
22:21 VAC Jordan, Gerardo FCES n Move turbopump on HAM8 Ongoing
22:28 PEM Robert, Genevieve, Sam LVEA n Taking pictures of PEM equipment 23:13
22:30 CAL Tony PCal Lab local PCal checks 23:03
23:08 VAC Janos LVEA n Valving out HAM6 turbo (on-chamber) Ongoing