Reports until 17:10, Wednesday 21 August 2024
LHO General
ryan.short@LIGO.ORG - posted 17:10, Wednesday 21 August 2024 (79635)
Ops Day Shift Summary

TITLE: 08/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY:

Arm gate valves (GV5 and GV7) were opened this morning, which allowed us to start recovering the IFO. See Elenna's alog for details in the process. Currently running through a full initial alignment now that the green camera references have been set.

Other items to note from the day are that the LVEA remains laser HAZARD following the camera adjustments on HAM6.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:17 VAC Jordan LVEA n Check RGA bakeout at HAM6 15:24
15:22 FAC Karen LVEA n Technical cleaning 16:22
15:57 VAC Jordan, Gerardo, Janos, Travis LVEA n Opening large GVs 18:01
16:48 SEI Jim LVEA n Unlocking HAM5/6 HEPI 17:02
17:52 PEM Robert, Genevieve, Sam FCES n Installing accelerometer 18:59
17:56 FAC Tyler, JohnsonC MY n Check fire system 20:35
18:40 VAC Janos LVEA n Shutting off turbos 19:14
19:14 OPS Tony LVEA N Laser Hazard transition 19:24
19:26 SUS Ibrahim MX n Looking for transport cases 20:07
19:32 ISC Camilla, TJ LVEA YES Adjusting HAM6 cameras 20:07
19:49 EE Fil LVEA/CER - Checking HV power supply 20:28
20:28 PEM Genevieve, Sam FCES n Checking PEM equipment 22:16
21:42 CAL Francisco PCal Lab Local Power cycling equipment 21:46
23:02 VAC Jordan, Janos LVEA - Checking RGA and turbos 23:39
23:04 ISC TJ, Camilla LVEA YES Fixing OMC TRANS camera 23:49