Sam, Robert, Genevieve
On Aug 21 we installed an accelerometer on the floor under HAM8 (H1:PEM-FCES_ACC_VEA_FLOOR_Z_DQ) and one on the beamtube (H1:PEM-FCES_ACC_BEAMTUBE_FCTUBE_X). These channels will be up and running once Fil has had a chance to run some cables. On Aug 27 we reconnected the three HAM8 accelerometers (H1:PEM-FCES_ACC_HAM8_FC2_Z, H1:PEM-FCES_ACC_HAM8_FC2_Y, H1:PEM-FCES_ACC_HAM8_FC2_X) whose cables were previously mixed up. All of these accelerometers are now connected to the correct channels.