Reports until 16:29, Friday 23 August 2024
H1 General
oli.patane@LIGO.ORG - posted 16:29, Friday 23 August 2024 (79674)
Ops Eve Shift Start

TITLE: 08/23 Eve Shift: 2300-0800 UTC (1600-0100 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 26mph Gusts, 22mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.12 μm/s
QUICK SUMMARY:

Currently at ACQUIRE_DRMI_1F. We've been working on locking, but progress has been slow due to high winds. A few minutes ago we were at LOWNOISE_ASC, but lost lock. Max power is currently set in lsc_params as 61W to hopefully bypass the new PI. Continuing locking attempts.