thomas.shaffer@LIGO.ORG - posted 16:34, Monday 26 August 2024 (79720)
Ops Day Shift End

TITLE: 08/26 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 139Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: The shift was mostly taken up by commissioning time. There was recovery from a CDS crash this morning, but recovery was pretty straight forward. The reacqusitions from the two lock losses one needed an initial alignment, the other did not. Minor interventions for both.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
23:58 sys h1 lho YES LVEA is laser HAZARD 18:24
16:11 FAC Tyler MY n Fire system check 19:11
16:11 FAC RDO (Tyler) Fire tank n Fixing big green 20:51
16:12 FAC Karen MY n Tech clean 17:28
16:48 FAC Kim MX n Tech clean 17:18
17:41 - Betsy, Travis FCTE n Moving hepa fan 19:26
20:37 FAC Tyler CS n Towing water tank around CS 20:47