TITLE: 08/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: A few lock losses during commissioning time and from an earthquake. We are recovering now and through DRMI.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 23:58 | SAF | H1 | LHO | YES | LVEA is laser HAZARD | 18:24 |
| 22:50 | VAC | Travis | LVEA | Yes | Parts recon | 23:01 |
| 23:22 | VAC | Travis | FCES | n | Parts recon | 23:28 |
| 23:28 | PEM | Robert | EY | n | Grab seismometer | 23:58 |