The 50mhz boost that I added to the SRM M1-M3 offloading back in the beginning of July was added to PRM today during the commissioning window. I haven't looked at data yet, but we were able to lock with it engaged. FM5 has been added to the safe and observe snaps and to the ISC_DRMI guardian.