TITLE: 09/01 Eve Shift: 2300-0500 UTC (1600-2200 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
SEI_ENV state: EARTHQUAKE
Wind: 8mph Gusts, 5mph 5min avg
Primary useism: 0.15 μm/s
Secondary useism: 0.08 μm/s
QUICK SUMMARY: H1 is relocking following a large EQ and possible aftershock. Tony ran an initial alignment and H1 just locked DRMI.