TITLE: 09/02 Eve Shift: 2300-0500 UTC (1600-2200 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
- 23:00 - Relocking after EQ; up to CHECK_AS_SHUTTERS
- 23:30 - Reached NLN, starting to troubleshoot SQZ issue - alog79859
- 00:18 - Started observing
- 01:35 - Lockloss from PI 28/29 ringup - alog79860
- 03:46 - Reached NLN and started observing
- Was relocking up to ENGAGE_ASC before losing lock
- Ran initial alignment
- Changed nominal max power from 61W to 60W to hopefully avoid the 80kHx PIs that caused the last lockloss
- Waited in OMC_WHITENING for 30 minutes to damp violins