Reports until 17:12, Wednesday 04 September 2024
H1 General
oli.patane@LIGO.ORG - posted 17:12, Wednesday 04 September 2024 (79908)
Ops Day Shift End

TITLE: 09/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Lockloss earlier in the morning was pretty easy to recover from, and commissioning went well
LOG:

14:30 Observing and Locked for over an hour
14:41 Out of Observing due to SQZer losing lock
    - We were having PMC PZT volts high notification before it lost lock, so makes sense
14:45 SQZer relocked, back into Observing
15:24 Lockloss, starting initial alignment
15:46 Initial alignment done, relocking
16:05 Lockloss from ENGAGE_ASC_FOR_FULL_IFO
    - A few minutes into this state, PR GAIN started falling but Sheila was able to save it by turning off the DARM offset. At this point the AS_AIR spot was looking misshappen, probably due to ASC pushing it in the wrong direction. Then we had the lockloss.
16:53 NOMINAL_LOW_NOISE

17:10 To NLN_CAL_MEAS for commissioning measurements
19:06 Back to NOMINAL_LOW_NOISE
19:26 Observing
20:20 - 20:25 PEM tests with shaking the fan outside and around the corner from the Control Room entrance

Start Time System Name Location Lazer_Haz Task Time End
15:19 FAC Karen OptLab, VacPrep n Tech clean 15:58
16:38 FAC Karen MY n Tech clean 17:32
16:39 FAC Kim MX n Tech clean 17:12
17:31 FAC Kim Receiving n Loading cardboard 18:31
18:11 FAC Karen WoodShop n Tech clean 18:41
20:18 PEM Sam outside n Shaking fans 20:24
20:53 VAC Janos MX, MY n Measurements 21:45
21:10 PCAL Franscisco PCAL Lab y(local) Preparing for measurements 22:13
23:42 PCAL Francisco PCAL Lab y(local) More PCAL stuff 23:49