H1 SEI
hugh.radkins@LIGO.ORG - posted 12:19, Friday 04 October 2013 (7995)
WBSC8 ETMX Friday Noon Update
Thomas, Mitchell & Jason got the majority of the fixturing out of the chamber, bagged & wrapped, and out of the VEA.  They then got the retroreflector hanging on the Quad.
We then unlocked the HEPI and leveled & set the elevation of the Optical Table per D0901152.  I set the system ~.5mm low as IAS found the Optic 0.4mm high on the Test Stand.  The level is within +-0.1mm and the elevation is within 0.3mm; good enough since we still likely have much horizontal adjustment to do.
With the retroreflector in place, we then shot an X position.  IAS is still evaluating that result.