paul.fulda@LIGO.ORG - posted 12:29, Friday 04 October 2013 (7997)
ALS beam blocked on PSL
To make the process of inserting the pick-off BS for the Faraday isolation ratio measurement easier, we blocked the ALS beam around the same location on the PSL table with a razor dump.
At the time of writing this, that beam is still blocked.