oli.patane@LIGO.ORG - posted 16:29, Monday 09 September 2024 (80000)
Ops Day Shift End

TITLE: 09/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Currently relocking and at ENGAGE_ASC_FOR_FULL_IFO. One lockloss today (79991) but not much to report. Relocking is taking a while because of changes in the ISC_LOCK code and not because of IFO issues.
LOG:

14:30UTC Observing and Locked for 4:50 hours
15:31 Out of Observing for Commissioning
18:31 Back into Observing
20:01 Out of Observing due to SQZer unlock
20:12 Lockloss
    21:45 Lockloss from LASER_NOISE_SUPPRESSION (probably user error/people on floor)
    22:41 Lockloss from ADS_TO_CAMERAS 

Start Time System Name Location Lazer_Haz Task Time End
15:05 FAC Karen VacPrep, OptLab n Tech clean 15:20
15:26 FAC Karen MY n Dumping garbage 17:10
15:29 FAC AC company VPW n New AC unit install 19:40
16:01 FAC Kim MX n Tech clean 18:07
17:12 FAC Mitchell EX n Grabbing dust monitor pump 18:39
17:51   Betsy CER, OptLab n Grabbing stuff and looking for sand 17:58
19:07 FAC Tyler OptLab n Looking at sandy flow bench 19:13
20:50 SQZ Vicky, Naoki LVEA YES ISS alignment on SQZT0 21:50