TITLE: 09/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
We’re trying to get to observing but waiting on SQZ Team to finish alignment. We've reached NLN twice now.
Locking started at 19:58 UTC where after our SR3 move, we went into initial alignment in prep for full IFO locking. Initial alignment finished at 20:37 UTC. It took a while because we had to move SRM to alignment with the new SRM and SR2 positions.
We fully automatically got to NLN at 21:18 UTC but lost lock 22 minutes later (21:41 UTC) for unknown reasons. We didn’t get to observing due to SQZ commissioning work happening at that time.
Following the lockloss, we were not able to lock X-Arm ALS, losing lock twice unexpectedly, prompting yet another initial alignment. This initial alignment stalled at SRC align, which was unexpected considering we just moved SRM to proper alignment manually at this state. Ryan C paused the state and apparently that was all that was needed in order for initial alignment to re-catch, finishing the process. Onto real locking.
We lost lock unexpectedly at CHECK_IR but in relocking, were able to lock DRMI without going through PRMI or MICH. We then fully automatically got to NLN for a second time. SDF Diffs from first NLN acquisition attached.
UPDATE 16:21 UTC:
We lost lock again from NLN during SQZ alignment, convincing me that perhaps the previous LL was also SQZ related. 14 min lock. On the bright side, it seems we are reliably locking to NLN following the SR3 movement.
Other:
Other/Opportunistic (All times in UTC):
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:58 | SAF | H1 | LHO | YES | LVEA is laser HAZARD | 18:24 |
14:43 | FAC | Karen | Optics, Vac Prep Labs | N | Technical Cleaning | 15:20 |
15:19 | FAC | Karen | EY | N | Technical Cleaning | 16:37 |
15:20 | FAC | Kim | EX | N | Technical Cleaning | 16:37 |
15:21 | IAS | Jason | LVEA | YES | Faro Movement | 15:58 |
15:21 | CDS | Fil | EY | N | PEM Chassis Change | 17:42 |
15:32 | FAC | Christina | Receiving/Hi-Bay | N | Forklift recycling | 18:46 |
15:32 | VAC | Jordan, Erik | LVEA | YES | HAM6 RGA | 16:03 |
15:34 | FAC | Nellie | FCES | N | Technical Cleaning | 16:36 |
16:06 | VAC | Jordan, Erik | LVEA | YES | HAM6 RGA: Part 2 | 16:25 |
16:21 | OPS | TJ | LVEA | YES | TCS Line Inspection | 16:49 |
16:22 | CDS | Marc | EX | N | DAC Transition from read only to read&write | 17:55 |
16:37 | SUS | Betsy, Travis | LVEA | YES | LVEA Chamber Sweep | 17:25 |
16:38 | IAS | Jason, Mitchell | LVEA | YES | FARO Work | 18:51 |
16:45 | FAC | Tyler | LVEA, MX, MY | YES, N, N | Routine 3IFO Checks | 18:11 |
17:01 | FAC | Karen, Kim | LVEA | YES | Technical Cleaning | 18:24 |
17:29 | SEI | Jim | LVEA | YES | Checking HAM1/2 cleanroom | 18:27 |
17:55 | FAC | Chris | LVEA | YES | Battery Maintenace | 18:16 |
18:01 | VAC | Janos, Gerardo | LVEA | YES | Capturing Photos | 18:20 |
18:01 | CDS | Marc | EX | N | DAC Transition Ctd. | 19:11 |
18:17 | FAC | Chris | FCES | N | Snorkel-lift Battery Maintenance | 20:16 |
22:20 | FAC | Chris | Optics Lab | N | Battery Check | 20:20 |