TITLE: 09/14 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Currently Oberving at 160Mpc and have been Locked for over 2.5 hours. Had one other lockloss today (besides the one we were relocking from when I came in), but besides running an initial alignment for that, it was hands off.
LOG:
23:00UTC Relocking and at ACQUIRE_DRMI_1F
23:35 Lockloss from LASER_NOISE_SUPPRESSOIN
00:49 NOMINAL_LOW_NOISE
01:07 Observing
01:09 Lockloss
01:09 Started an initial alignment
01:31 Initial aligment done, relocking
02:18 NOMINAL_LOW_NOISE
02:21 Observing
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
00:15 | PCAL | Dripta | PCAL Lab | y(local) | Quick PCAL trip | 00:21 |