Displaying report 1-1 of 1.
Reports until 16:42, Sunday 15 September 2024
LHO General
ryan.short@LIGO.ORG - posted 16:42, Sunday 15 September 2024 (80103)
Ops Day Shift Summary

TITLE: 09/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Very uneventful shift until towards the end when a large earthquake knocked H1 out of lock after 15.5 hours.

Still waiting for ground motion to calm down before untripping things and starting alignment.

LOG:

No log for this shift.

Displaying report 1-1 of 1.