Reports until 16:37, Monday 16 September 2024
LHO General
ryan.short@LIGO.ORG - posted 16:37, Monday 16 September 2024 (80124)
Ops Day Shift Summary

TITLE: 09/16 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: After several EQs overnight ringing up violins, we took time to damp them before commissioning this morning. One lockloss after getting back to observing, followed by a straightforward relock.

H1 has now been locked and observing for almost 3 hours.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
23:58 SAF H1 LHO YES LVEA is laser HAZARD Ongoing
15:19 FAC Karen Vac/Opt Labs n Technical cleaning 15:57
15:42 PCAL Tony PCal Lab Local Testing 16:05
15:57 FAC Karen MY n Technical cleaning 17:31
16:28 FAC Kim MX n Technical cleaning 17:12
19:10 TCS Camilla Opt Lab n Grabbing parts 19:31
20:04 PCAL Tony PCal Lab n Packing equipment 21:59
21:06 TCS Camilla Opt Lab n Packing equipment 21:36
22:42 PEM Sam, Genevieve MER n Checking HVAC tube 22:49