Displaying report 1-1 of 1.
Reports until 07:48, Tuesday 17 September 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 07:48, Tuesday 17 September 2024 - last comment - 07:58, Tuesday 17 September 2024(80130)
Tuesday Maintance Ops Shift Start

TITLE: 09/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 3mph Gusts, 2mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.08 μm/s
QUICK SUMMARY:

H1 is locked for over 5 hours  but not observing. Looks like we were taken out of Observing at 7am.
Most Likely because it's running the Magnetic injections.
Inlock charge measurements are next.

 

Comments related to this report
anthony.sanchez@LIGO.ORG - 07:58, Tuesday 17 September 2024 (80131)

Work to be done today:

CDS - [ISC, SUS] EX - Swap the SUS signals from the 18 and 20 bit 8ch DAC's over to the LIGO 32 bit 32ch DAC at SUS-EX. (Marc, Fil, Daniel) WP 12079

Access Laser LVEA TCS table tour (Camilla, TJ?) WP12080

TCS - 8a to 8:15a [LVEA HWST] Reinstall Hartmann Sensor Masks On TCSHT4R HWS Table (Camilla)

VAC- [CP1 (Y Arm) / CP2 (X Arm)] Outside Work -- Radiator (or vaporizer) examination. (Gerardo, Travis, Jordan) WP12083  -- postponed

VAC- [CE/MR] Power down the ion pump controller, to then move the controller within the rack, and connect new signal cables. (Jordan, Travis, Gerardo) WP12085

New Guardian node TEST_NOTIFY. (TJ) WP12091

SEI - [EX] Recenter BRSX. Turn on picomotor, adjust BRSX adjustment mass. (Jim) WP12088

CDS- [PEM] Verify cabling for PEM sensors in the FCES. New cabling for Ham floor and beamtube accelerometers will be installed. (Fil, Dave) WP12089

8a SQZ: SQZT0 Realign PUMP AOM --Postponed

SQZ: [With IFO, Nominal Low Noise] Go to 0V psams with locked IFO turn off PSAMs driver (during IFO thermalization time). -- postponed