Reports until 20:11, Sunday 06 October 2013
H1 ISC
rich.abbott@LIGO.ORG - posted 20:11, Sunday 06 October 2013 (8015)
HAM1&6 ISC Electronics Installation Work (V3)
Sheila, Alexa, Stefan, Rich

Present Status:
1.  Day started with one DC cable needing to be fixed.  We did this and all the RFPDs are properly powered now.
2.  After getting DC stuff going, found one bad connection in an RF cable due to the 5-way coaxial connector not being properly seated.
3.  When we undid the 5 way coaxial connector, the 4-40 helicoil came out of the RFPD.  Now things went downhill.  We spent many hours going through bag after bag in the LVEA, Staging building, and X-end station looking for a 4-40 helicoil insertion tool and a single class A clean 4-40 helicoil.  Never found any.  Took one from a perfectly good cable which must now be fixed later.
4.  As of now, 100% of the electrical components in HAM1 are functional.
5.  Bolted down and optically aligned REFL A&B, and REFL LSC detector.  Didn't have a beam to align LSC POP detector, so it's bolted down, but not final aligned with light

Next Actions:
1.  Complete and log the RF transfer functions to establish reference levels for each signal at the respective operating frequency (test input to each RF output)
2.  Clean up the cable routing in HAM1
3.  Final table balancing
4.  Log all data taken during checkout
5.  ASC screen checkout