TITLE: 09/17 Eve Shift: 2300-0800 UTC (1600-0100 PST), all times posted in UTC
STATE of H1: Calibration
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:
Tony took H1 to Observing, during our Ops hand-off, ending a long Maintenance. Winds were high during the afternoon peaking at about 2315utc; H1 had lower range during this windy beginning of shift, but either thermalization and/or dying winds helped with H1 range hovering around the "usual" 160Mpc.
Dropped from Observing for a thermalized calibration requested by Jenne (with Louis helping).
LOG: