Displaying report 1-1 of 1.
Reports until 16:31, Wednesday 18 September 2024
H1 General
oli.patane@LIGO.ORG - posted 16:31, Wednesday 18 September 2024 (80174)
Ops Day Shift End

TITLE: 09/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Observing at 155Mpc and have been locked for almost an hour. Quiet day with one lockloss but hands-off relocking.
LOG:

14:30 Relocking and at CARM_5_PICOMETERS
15:05 NOMINAL_LOW_NOISE
15:09 Observing
21:13 Lockloss
    21:33 Lockloss from CHECK_MICH_FRINGES
    21:38 Lockloss from FIND_IR
22:37 NOMINAL_LOW_NOISE
22:39 Observing                                                                                                                                                                                                                                                                                                                                                                                                                                                              

Start Time System Name Location Lazer_Haz Task Time End
15:03 PEM Robert LVEA Receiving Door n Moving stuff 15:05
15:30 FAC Eric EX, EY n Checking glycol levels 16:52
15:37 FAC Karen Optics lab & Vac Prep N Technical cleaning 15:53
19:12 FAC Kim Receiving Door n Opening it 20:12
20:37 FAC Tyler MX, MY n 3IFO and Safety checks 22:30
21:34 FAC Fil Roof n Grabbing the lightning rod 22:34
Displaying report 1-1 of 1.