TITLE: 09/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 153Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
LOG: The range was in the upper 150s for most of shift, we've been locked for almost 19 hours!
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:58 | SAF | H1 | LVEA | YES | LVEA is laser HAZARD | 18:24 |
16:08 | PEM | Robert | Yarm | N | PEM measurements, left at 16:20, 18:22 | 17:28 |
22:11 | VAC | Janos | Site | N | Cryopump checks | 22:27 |
23:16 | PEM | Robert | Y-arm | N | Setup test equipment | 01:16 |
HAM6 OMC TRANS camera was pretty jittery the whole shift
18:15 UTC, EDC reports 12 DC chans again, from NUC33. The NUC doesn't look frozen as the SQZ plot is still updating.