Reports until 16:32, Monday 23 September 2024
H1 General
ryan.crouch@LIGO.ORG - posted 16:32, Monday 23 September 2024 (80247)
OPS Monday day shift summary

TITLE: 09/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Commissioning tasks completed: A2Ls gains, HAM1 PEM shaking tests, phasing POP9. We've been locked for a little over an hour, conditions are calm.
LOG:                                                                                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
23:58 SAF H1 LVEA YES LVEA is laser HAZARD 18:24
14:30 FAC Karen Optics lab, vac prep N Tech clean 14:51
15:44 PEM Robert LVEA Y Turn on HAM1 shaker 15:48
16:00 FAC Karen MidY N Tech clean 17:04
16:30 FAC Kim MidX N Tech clean 17:17
16:45 VAC Janos MidY N VAC checks, mech room 17:26
16:47 CAL Tony PCAL lab Y PCAL work, tues prep 17:39
17:10 PSL Sheila LVEA N Plug in cable at PSL racks 17:15
18:32 PEM Robert LVEA Y Turn off HAM1 shaker 18:38
18:33 PSL Sheila LVEA Y Unplug cable at PSL racks 18:38
19:02 CAL Tony PCAL lab Y PCAL work 19:17
20:29 CAL Tony PCAL lab Y PCAL work 21:49
22:03 CAL Tony PCAL lab Y PCAL work 22:48